4 Problems Drone Surveys Catch Before Solar Farm Construction Starts

Written by Team SmartDrone | Feb 4, 2026 12:11:16 AM

Ground crews spend weeks collecting elevation points across 200-acre solar sites, working around vegetation and terrain constraints that slow access. The selective sampling approach they use—measuring accessible points and interpolating between them—works only if developers can wait weeks for results. Most can't. They're comparing multiple properties simultaneously and need complete terrain intelligence in days to make acquisition decisions.

The problem with selective sampling isn't just speed. It's what gets missed between measurement points. A drainage channel that lies between the survey locations isn't present in the data. Slope transitions that weren't measured produce grading estimates that look solid until contractors encounter terrain conditions nobody documented. Foundation specifications work well on paper, but require costly field modifications once crews see what they're building on.

These problems surface after construction starts, when fixing them costs substantially more than getting accurate data beforehand would have. Firms winning solar contracts document entire properties in hours using LiDAR platforms that capture millions of elevation points, where ground-based methods manage thousands.

READ MORE: When Drone Platforms Make Sense for Your PLS Project

1. Terrain Models That Determine Grading Costs

Complete Coverage vs. Selective Sampling

LiDAR-equipped drones capture millions of elevation points across properties, documenting every ridge, depression, and slope transition rather than sampling accessible locations and interpolating between them. For solar installations spanning hundreds of acres with variable topography, this distinction drives project economics.

Engineers working with complete elevation data see exactly where panels can follow natural contours and where terrain requires grading work. Ground surveys that collect measurements at accessible points are suitable for small properties with gentle terrain. Solar sites rarely meet that description. When drainage features and slope changes fall between measurement locations, they are not captured in terrain models or grading estimates.

Contractors encounter them anyway. A missed swale triggers a change order because earthwork quantities no longer match the approved quantities. These surprises compound across hundreds of acres, turning modest estimation errors into substantial budget problems.

Accurate Earthwork Estimates During Feasibility

Developers comparing multiple properties need accurate cut-and-fill calculations during feasibility analysis, when that information can still guide acquisition decisions. Sites requiring excessive grading should fail economic review before developers commit capital—and they do, when terrain data supports reliable estimates.

The problem comes when initial surveys produce approximations that collapse once construction reveals conditions that the partial data missed. We've seen utility-scale installations pass preliminary review based on incomplete surveys, only to fail detailed financial analysis when comprehensive terrain data revealed the true grading costs. Even modest underestimates create budget problems that threaten project viability.

Variable Slopes and Foundation Requirements

Steep areas demand engineered foundations that cost substantially more than standard posts, while rapid slope transitions require variable depths and specialized installation, which drive up labor costs. Selective point collection misses these localized conditions because they fall between measurement locations.

Complete elevation data shows exactly where foundation requirements change across properties, supporting accurate specifications and cost estimates before construction mobilizes. That prevents the expensive field modifications that occur when crews arrive expecting a standard installation and discover terrain that demands engineered solutions no one budgeted for.

2. Drainage Patterns That Prevent Erosion Failures

Why Drainage Problems Surface After Installation

Storm events channel runoff into concentrated flow paths that accelerate erosion beneath installed arrays, undermining foundations and exposing conduit. But drainage problems stay hidden during construction and commissioning, surfacing only after panels are energized and generating revenue.

That first major storm reveals issues nobody documented during site evaluation, and by then you're facing emergency repairs on an operational installation instead of design modifications during planning.

Ground surveys interpolate terrain between measurement points rather than documenting it directly. The depressions and slope changes that channel water across properties aren't captured in interpolated models, so engineers can't predict where runoff will concentrate or calculate the flow volumes their stormwater systems must handle. Properties that appeared manageable during evaluation become erosion-prone once panels are installed, requiring expensive remediation.

Documenting Every Drainage Pathway

Professional drone mapping services document every drainage pathway across properties instead of interpolating between sample points. Hydrologists modeling water movement need this comprehensive coverage to identify high-risk areas where runoff concentrates and determine what infrastructure projects require.

The difference shows up when weather tests the systems—complete documentation produces drainage designs that perform as intended, while partial sampling produces designs that look adequate until actual storms reveal the problems. For projects requiring regular monitoring and progress documentation, this baseline terrain data becomes essential for tracking site changes throughout construction and operations.

Stormwater Infrastructure Costs

Poor natural drainage demands engineered solutions: swales that redirect flow, infiltration basins that slow runoff, and control structures that distribute water across sites. These systems add substantial cost and permitting complexity that extends timelines.

Identifying these requirements during initial surveys gives engineers options—they can route arrays around problem areas or budget appropriate infrastructure from the start. Either approach is preferable to discovering drainage challenges after acquisition, when you're absorbing costs the feasibility analysis never anticipated.

Environmental agencies pursue enforcement when erosion control fails and sediment is carried off properties during storms. The violations and remediation expenses that follow dwarf the cost of comprehensive surveys. Complete terrain data during site selection shows actual stormwater requirements when that information can still shape decisions instead of just creating problems.

READ MORE: What Are the Different Drone Capabilities? LiDAR, Orthoimagery & Linework Explained

3. Vegetation Density and Development Economics

Mapping Ground Surface Beneath Tree Cover

Dense vegetation affects solar development by increasing clearing costs and extending timelines due to environmental permitting. Both factors influence project economics, but you can't model them accurately without knowing what's underneath the tree cover. Satellite imagery shows the canopy but not the ground surface beneath it.

LiDAR penetrates tree cover to map actual ground surfaces, revealing the slope conditions, drainage features, and terrain complexity that determine whether forested sites work economically. Some properties that appeared promising based on satellite analysis prove impractical once you see the ground underneath—steep terrain requiring extensive grading, drainage patterns demanding expensive stormwater infrastructure, or access constraints that drive road construction costs beyond feasibility budgets.

Ground crews struggle to access dense vegetation for data collection. Aerial survey platforms work regardless of tree cover, revealing terrain that would otherwise stay hidden until clearing begins. Discovering these conditions during site selection creates options, whereas discovering them after acquisition incurs costs that directly affect project margins.

Long-Term Vegetation Management Costs

Clearing costs represent one-time expenses, but vegetation management continues throughout operational life. Arrays requiring frequent work to prevent shading incur higher maintenance costs over their 25-year lifespans. These recurring expenses reduce operational returns year after year.

Initial survey data can reveal these requirements during feasibility analysis, before installation, rather than after shade losses begin to degrade performance metrics. That enables developers to model long-term costs when making site-selection decisions.

4. Slope Analysis and Long-Term Stability

Slope Variation and Foundation Specifications

Terrain slope drives foundation specifications across hundreds of acres, but slope conditions rarely stay uniform. Steep sections experience higher erosion potential and require deeper post installations with stabilization measures. Areas with rapid slope transitions demand foundation designs that adapt to changing conditions rather than standard specifications used everywhere.

Engineers working with interpolated terrain models might specify standard posts across sections that actually need engineered foundations, or overspecify expensive solutions for areas where standard installation would work. Either scenario creates problems—underspecified foundations fail during construction review and require redesign, while overspecified foundations waste budget. Both outcomes delay schedules.

Matching Foundation Designs to Measured Terrain

Complete elevation data reveals slope percentages throughout installations. Civil engineers use this information to specify appropriate post depths, soil anchoring systems, and erosion controls for each zone based on measured conditions rather than interpolated assumptions.

The result is foundation designs that match site requirements: engineered solutions where terrain demands them, standard installation where conditions allow it, and accurate cost estimates that hold up during construction.

Professional solar site surveys include ground control implementation by licensed surveyors establishing GPS-based control networks across properties, with drone-collected data tied to these surveyed points throughout the site. Deliverables integrate directly into CAD and civil engineering software without requiring format conversion.

READ MORE: A Short Guide on How to Interpret Drone Survey Results

Conclusion

Ground-based methods collecting selective measurements can't deliver the comprehensive coverage solar developments require on developer timelines. The gaps in selective sampling surface as expensive problems during construction, when fixing them costs substantially more than comprehensive surveys would have.